Project Description

Spectrum Mechanical worked in conjunction with Wespac Construction to build out 110,000 SQFT of a 2-story grey shell office building. This project includes packaged rooftop units serving the second floor and split system units serving the 1st floor controlled by an integrated EMS system.

Contractor: Wespac Construction
Location: Mesa, AZ
Size: 110,000 SQFT
System Type: Package Rooftop Units (2nd Floor) Split System Units (1st Floor)
Date of Completion: 2016